MCA2 (422 S 11th St) is where 100% of McAllen’s networks interconnect—the home of the city’s meet-me-room and the landing point for all international fiber crossings.
Purpose-built and MDC-owned, this 1 MW facility built to Tier III standards powers the region’s carrier-neutral ecosystem—bringing together the networks, content providers, and operators that connect Mexico and the world.
| Electrical Capacity | 500 kW to upgrade 1 mW |
| Battery Backup | 20 min. in AC; 2 hrs. in DC |
| Utility Voltage | 480/277/208/120 Volts |
| Emergency Power Plant | Emergency Power Plant |
| Cooling Configuration | N+1 CRAC |
| Internet Exchange Point | 10G, 100G Ports |
| Fire Suppression | CO2 |
Complete the brief form and a MDC representative will get in touch with you.