Nogales serves as a key connectivity gateway between the southwestern United States and the growing digital markets of northwestern Mexico. MDC Nogales enables networks to efficiently access this expanding regional corridor.
The carrier-neutral facility supports Smart Interconnections through International Fiber Crossings (IFCs) linking the U.S. and Mexico. As investment across the Arizona–Sonora corridor accelerates, MDC is planning future expansion of the Nogales site to support increasing cross-border connectivity demand.
| Electrical capacity | 72 kVA |
| Battery Backup | 150 min |
| Utility Voltage | 208 Volts |
| Emergency Power Plant | 30 Kw |
| Power autonomy | 48 hrs with full tank before first diesel load |
| Generator Redundancy | N |
| Cooling | N+1 |
| Fire Suppression | CO2 |